Nabinagar Power Generating Company Limited (NPGCL)

Nabinagar Power Generation Company Pvt. Ltd.
Nabinagar Power Generation Company Pvt. Ltd.(NPGCL) is a joint venture between NTPC and Bihar State Power Generation Company Limited located in Aurangabad district with capacity 1980 MW (3X660 MW, Stage I) and Proposed 3×800 MW for Stage II. A proposal has been sent to Joint Secretary (Thermal), MoP, GoI from Principal Secretary, Energy Department, GoB for installation of three units of 800MW in place of proposed 660 MW under Nabinagar Stage II by Nabinagar Power Generating Company Pvt. Ltd.
PPA was signed for 3X660MW (Stage I) with erstwhile BSEB on 22.01.2010 and for 2X660MW (Stage II) with erstwhile BSEB on 15.01.2011
MoU was signed between erstwhile BSEB and NTPC on 14.10.2007.
Water Approval has been obtained for 125 Cusec Water by CWC on 11.08.2010 from Sone River (Indrapuri barrage)
Coal Requirement Details: Coal linkage from North Karnpura Coalfield, CCL Stage – I – 11.25 MillionMT/ Annum and Stage – II – 10.333 MillionMT/ Annum
Power allocation to Bihar will be 3X660(Stage I) 69.37% (1373.5 MW)+179 MW(surrender by West Bengal and allotted to Bihar) = 1552.5 MW and 2X660 MW (Stage II) 75%(990 MW).